Bakers Place Case Study
Case Study/Research Report
Architects & Engineers, Broader Industry
A comprehensive case study examining environmental, economic, and scheduling performance of different structural systems applied to the same 14-story mixed-use development in Madison, WI. Conducted by The Neutral Project with funding from USDA Wood Innovations Grant Program and Softwood Lumber Board. The study compares Mass Timber-Steel Hybrid (baseline), All Mass Timber, All Steel, and Post-Tensioned Concrete schemes through detailed structural analysis, cost estimation, scheduling analysis, and whole-building life cycle assessment. Team included Michael Green Architecture, EQUILIBRIUM, Priopta, Arup, RDH Building Science, C.D.Smith, and USDA Forest Products Laboratory.

Top Challenges Addressed
The Neutral Project LLC (with USDA Wood Innovations Grant funding)
#11 - Not Valuing Carbon, #12 - Designer Inexperience Loop, #22 - Carbon Calculation Complexity